Strike Energy has suspended activities at the West Erregulla 3 (WE3) well in the North Perth Basin for approximately two weeks due to abnormal over-pressured gas zones. The company, which operates WE3
Read More
West Erregulla JV builds Perth Basin confidence
Strike Energy has revealed that initial drilling results at the West Erregulla 3 well in the onshore Perth Basin in Western Australia indicate conventional potential. The company, on behalf of its EP469
Read More
Read More
Strike overcomes fault during West Erregulla drilling
Strike Energy has drilled the second intermediate hole section as part of the West Erregulla drilling program in Western Australia to a final depth of 3534 metres. The company advised that the section
Read More
Read More
West Erregulla project back on track
Strike Energy has advised, on behalf of its joint venture partner Warrego Energy, that it has installed the new slip and seal assembly required for the West Erregulla 3 well, Western Australia. The company
Read More
Read More
West Erregulla JV completes first phase of drilling
Strike Energy has advised, on behalf of its joint venture partner Warrego Energy, that it has completed drilling of the first intermediate hole section down to 2462 metres measured depth at West Erregulla 3 well, Western Australia.
Read More
Read More
West Erregulla JV continues drilling success
Strike Energy has advised, on behalf of its joint venture partner Warrego Energy, that it has completed drilling of the first intermediate hole section down to 2462 metres measured depth at West Erregulla
Read More
Read More
West Erregulla JV begins drilling
Operator Strike Energy has commenced the drilling of the West Erregulla 3 well in Western Australia.
Read More
Read More
Strike prepares to drill West Erregulla well
Strike Energy has reported that Rig 970 has been mobilised and is ready to begin drilling at the West Erregulla 3 well in Western Australia.
Read More
Read More
West Erregulla JV prepares to drill next well
Strike Energy has reported that Rig 970 has been mobilised and is ready to begin drilling at the West Erregulla 3 well in Western Australia. The EP469 joint venture (Strike, Warrego Energy) is planning
Read More
Read More
West Erregulla JV secure rig for drilling
The West Erregulla joint venture has agreed to a long-term contract with Ensign Energy Services for drilling services at the Perth Basin project with the Ensign 970 rig. Strike Energy stated that West
Read More
Read More