Triangle Energy, Talon and New Zealand Oil & Gas have reviewed the interpretation of the Bookara 3D seismic and confirm multiple prospects within the two permits in the Perth Basin.
Read More
Triangle Energy has refocused on lifting oil output and securing alternative export routes in preparation for the Kwinana export route closure. Read More
Triangle Energy has begun a front end engineering design (FEED) study for a proposed 5000 barrel per day modular, flexible feed renewable fuel refinery (RFR) in Western Australia. Read More
The Cliff Head joint venture (CHJV) has entered into an agreement with BP Singapore for the sale and purchase of its crude oil produced at the Cliff Head oil field. Under the terms of the offtake agreement,
Read More
Triangle Energy and Key Petroleum have further extended the cut off date for the sale and purchase agreement to acquire a 50 per cent interest in Key’s production licence L7(R1) and its combined 86.94 per cent interest in exploration permit EP 437. Read More
Triangle Energy, on behalf of the joint venture, has advised that the CH-6 well at the Cliff Head oil field, offshore Western Australia, has returned to production. The workover program of the CH-6 well
Read More
Triangle Energy has completed a review of the prospects and leads portfolios within the L2 (R1) licence (L7) in Western Australia, which it holds a 50 per cent interest in. Read More
Triangle Energy has extended the cut off date for the sale and purchase agreement with Key Petroleum to acquire its 50 per cent interest in production licence L7(R1) and its combined 86.94 per cent interest in exploration permit EP 437. Read More
Triangle Energy and Pilot Energy have signed the Perth Basin project agreements and access deeds that formalise the WA-481-P upstream and Cliff Head wind and solar joint ventures. As part of the WA-481-P
Read More