Dorado

Santos awards Atteris Dorado subsea contract

Atteris has secured the subsea front-end engineering design feed (FEED) for the Dorado development by Santos in the Bedout Sub-Basin, Western Australia. The engineering design work will include flow assurance
Read More
Dorado Project

Sembcorp secures Dorado project contract

Sembcorp Marine Rigs & Floaters has secured a contract from Altera Infrastructure GP LLC, to undertake the front-end engineering design (FEED) work for the floating production, storage and offloading
Read More