The national petroleum regulator has approved Santos’ Barossa Development for its plans to commence a drilling and well campaign in the second quarter of 2022. The company advised that, as part of the
Read More
Santos puts forward further plans for Barossa
The national petroleum regulator is assessing Santos’ Barossa Development for its plans to commence a drilling and well campaign in the second quarter of 2022. The company advised that, as part of the
Read More
Read More
Bayu-Undan phase 3C production exceeds Santos’ expectations
Santos, as operator of the Bayu-Undan joint venture, has announced that production from the phase 3C infill drilling program at the Bayu-Undan field has begun, with the first well producing better than
Read More
Read More
Santos prepares for Bayu-Undan decommissioning
Santos has submitted an environmental plan to the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) for the decommissioning of a pipeline between the Bayu-Undan platform
Read More
Read More