Carnarvon Energy has reported that design and engineering work for the production facilities for the Dorado Phase 1 liquids development continues to progress as expected.
Read More
Santos locks in approval for Bedout survey
The national regulator has cleared Santos to undertake a 3D seismic marine survey over a portion of exploration permit areas in the Bedout Sub-Basin offshore Western Australia.
Read More
Santos WA survey under determination by NOPSEMA
Santos have proposed to undertake a 3D seismic marine survey over a portion of exploration permit areas in the Bedout Sub-Basin, offshore Western Australia.
Read More
Read More
NOPSEMA opens Santos survey for comment
Santos have proposed to undertake a 3D seismic marine survey over a portion of exploration permit areas in the Bedout Sub-Basin, offshore Western Australia. Currently under assessment by the Australian
Read More
Read More
Dorado JV awards contracts for floating vessel
Santos and Carnarvon Petroleum have awarded three pre-front end engineering design contracts for work on the floating production storage and off take vessel, and the well head platform at the Dorado project
Read More
Read More
Supply imbalance needs to be addressed: ACCC
The east coast gas market is at a crossroads and the only real choice is to address the fundamental supply problem, particularly in the south.
The supply situation is most stark in the case of the southern
Read More
Read More