, , , , , , , , , , ,

Santos awards Atteris Dorado subsea contract

Dorado

Atteris has secured the subsea front-end engineering design feed (FEED) for the Dorado development by Santos in the Bedout Sub-Basin, Western Australia. The engineering design work will include flow assurance definition and design of the subsea system connecting the wellhead platform to the FPSO including the flexible flowlines, dynamic risers and a mid-water arch structure. …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend