The national regulator is assessing Santos and SK E&S Australia’s plans to develop a new 285 km pipeline from the Barossa floating production storage and offloading (FPSO) facility to the existing Bayu-Darwin pipeline. The pipeline would be laid within existing petroleum permits NT/L1 and NT/PL5, with the water depth along the pipeline route varying from 33 …