, , , , , , , , , , , , , ,

Lakes Oil maintains Nangwarry-1 drilling timeline

oil and gas industry workers
The 13 3/8’ diameter surface casing was set and cemented to a measured depth of 799m last weekend. Following pressure testing of the casting to confirm integrity, drilling recommenced on Monday December 9 and is, as of 6am today, drilling through the Eumeralla formation at 952m measured depth. The Nangwarry-1 well is within Petroleum Exploration …
To access this post, you must purchase a subscription. If you have an existing subscription, please login here.
Previous ArticleNext Article