The Santos-operated joint venture (JV) recently completed operations at the Dorado-2 appraisal well in the Bedout Basin, having now moved on to Roc South-1 located approximately 15 km northeast of Dorado-1. The Noble Tom Prosser jack-up rig has drilled the surface hole down to around 195 m measured depth in preparation for installation of surface …