Worley has won an engineering and services contract with H2U Group for the front-end engineering and design (FEED) phase of the Eyre Peninsula Gateway project in South Australia. Integrating a 75 MW electrolysis plant, and a 120 tonnes per day (tpd) ammonia synthesis plant, the demonstrator stage will have a total production capacity of up …