, , , , , , , , , , , , , ,

Glenaras well suspended

Galilee Energy said the Glenaras 15L well’s deliverability has been beyond the initial design criteria, but production and downhole pump issues have arisen as the company attempts to maximise the well’s drawdown. Galilee has secured a workover rig and expects a larger downhole pump system to be installed within the next two weeks, meanwhile the …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend