, , , , , , , , ,

Glenaras project starts measuring flow

Galilee Energy reported installation and commissioning of the new transformer and higher capacity variable speed drive to add additional flow capacity to Glenaras 12L has been completed and both wells are now back on full production. Both Glenaras 10L and Glenaras 12L are on continuous production with water rates of up to 3,600 barrels of …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend