, , , , , , , , , , ,

GBDJV rig moves to Albany-1

The GBDJV rig has completed casing in Albany-2 with a 4.5 inch (add mm) casing run to a measured depth of 2,599 m and cemented in place, making the upper Lake Galilee reservoir sands and the top section of the thick lower sand available for stimulation and testing later this year. The rig was then …
To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend