, , , , , ,

Gas2Grid faces difficulty after drilling

The Cebu Island operations included re‐entering the cased section of the well and drilling out the two cement plugs which revealed gas had circulated out of the hole. The well was cleaned out to a depth of 1913.7m from ground level and the drilling assembly was being pulled out of the hole. The casing shoe …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend