, , , , , , , , ,

Galilee installs new pump at Glenaras well

Following installation of the new pump, the pilot is currently producing water rates of approximately 3,900 barrels of water per day from both wells. href=”https://galilee-energy.com.au/”>Galilee will provide a further update on gas rates as fluid levels in the wells are reduced the their maximum and more coal area is drawn down below the critical desorption …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend