, , , , , , , , , ,

Frey fails for Senex

Located in PEL 93 in the southwestern Cooper Basin, Frey-1 was designed to test the hydrocarbon potential of the top Namur Sandstone and Murta Formation interval in a four-way dip closed anticline, evident at all stratigraphic levels. Frey-1 reached a total depth of 1,394 m on 29 September, failing to encounter significant hydrocarbons and will …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend