, , , , , , , , ,

FAR on track for first Sangomar oil production

Survey

In December 2018, Woodside (35 per cent) was appointed operator of the development and commenced front-end engineering and design activities. The joint venture also includes Cairn Energy Senegal (40 per cent), FAR (15 per cent) and Petrosen (10 per cent). Sangomar’s phase one development concept is for a stand-alone floating production storage and offloading (FPSO) …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend