, , , , , , , , , , ,

Drilling continues in Amadeus Basin

Project operator Santos and JV partner Central Petroleum have drilled the exploration well to 2,604 m measured depth, with a 273 mm surface casing now cemented in place. Central reported that low background gas levels were observed while drilling through the Gillen Formation, with a forward plan to dill out the shoe track and perform …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend