, , , , , , , , , , ,

Dorado drilling takes another step

Joint venture (JV) partner Carnarvon Petroleum reported that the 12 inch (311 mm) hole in the well has now been drilled, with the 9.625 inch (244 mm) casing having been set and cemented in place. The 8.5 inch (215 mm) hole has now been drilled to the coring point of approximately 3,935 m measured depth, …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend