Australia, Basin review, Bedout Basin, Company news, Drilling, Gas, Location, Markets, News, Offshore, Oil, Online Subscription, Projects, Western Australia
Dorado-3 well progressing
The well has been drilled to a depth of approximately 2,656 m depth with a 13.38 inch (339 mm) casing set in place, with the well to be drilled ahead today to approximately 3,180 m. When the 12.25 inch (311 mm) hole gets to a depth of around 3,880 m, a 9.63 inch (244 mm) …