, , , , , , , , , , ,

Dorado-1 drilling underway

Since arriving on site, the rig successfully completed the ready to operate process, drilled the 36 inch (914.4 mm) conductor hole, finished running and cementing the 30 inch (762 mm) surface casing and is preparing to drill the 17 ½ inch (444.5 mm) section. The rig will drill the 17 ½ inch hole to the …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend