AGIG will design, construct and operate a new 30 inch diameter, 3.2 km pipeline connecting the noreferrer”>Woodside-operated Pluto LNG Plant to the North West Shelf’s (NWS) Karratha Gas Plant. The
Read More
Testing underway at Reid’s Dome
State Gas has suspended drilling of the Aldinga East-1A well, located in PL 231 in Queensland, at a depth of 882 m with
Read More
Read More
JV bullish about Albany Field
JV partners Comet Ridge and Vintage
Read More
Read More
Well back online at Glenaras
Late last month, project operator Galilee Energy suspended production of the Glenaras 15L well after attempts to maximise
Read More
Read More
Concerns raised over Bight chemicals
Prepared by James Cook University Professor Jodie Rummer and Greenpeace, the report alleges Equinor’s response to any potential
Read More
Read More
Scarborough resource significantly increased
Located mainly within the WA-1-R lease offshore Western Australia, the Scarborough field is a gas resource operated by
Read More
Read More
Testing plans for Dombey
A joint venture (JV) between operator Beach and
Read More
Read More
Bunian 5 flow result “excellent”
Bass said the well had averaged 1,128 bbl/d of oil with a two per cent water cut, with production recorded on a fully
Read More
Read More
“Things are on track” with Browse
Browse is a $29 billion gas project located offshore Western Australia and operated by Woodside, and its
Read More
Read More
Santos in for Beehive
Located in the WA-388-P permit in the Joseph Bonaparte Gulf, offshore northern Australia, the Beehive prospect is 100 per cent owned by target=”_blank” rel=”noopener noreferrer”Melbana
Read More
Read More