Easternwell sign drilling contract

The contract, valued at $8.9 million, involves the drilling of two wells to depths of 4,000 m and 4,300 m using Easternwell’s Rig 106. “We are pleased to work with Origin on this important project
Read More

APLNG scheduled for shut down

Maintenance works on half of the train will be undertaken from July 17 to July 22, followed by two similar outages on August 21-26
Read More

Potential play for Senex

The well is located on the southwest margin of the Allunga Trough, a proven gas fairway, approximately 37 km southwest of the Moomba Processing Facility. Designed to evaluate the gas potential of the
Read More

Glenaras skids installed

Concurrent with drilling operations, all surface facility skids have been constructed, while the water production flowline connecting the Glenaras multilateral pilot program to the
Read More

Jaws stimulation success

Part of Strike’s Southern Cooper Basin Gas Project (SCBGP), the stimulation program included the successful deployment of five of the first indirect vertical fractures executed in Australia. All
Read More

Armour spuds Myall-4

Ensign drilling rig 964 is currently drilling ahead in the 12 ¼ inch (311.15 mm) section of the hole to a planned measured depth of 480 m. The 9-â…? inch (244.475 mm) casing will then be set and cemented
Read More

FID reached for Arcadia

The $400 million Arcadia investment is in addition to the $900 million invested in upstream developments in the Maranoa, Western Downs, Central Highlands and
Read More

Glenaras closing in on production

Part of Galilee’s Glenaras Gas Project in ATP 2019 (formerly ATP 529) in the Galilee Basin in Queensland, the Glenaras-10L and -12L multilateral drilling campaigns were completed by the Easternwell
Read More