Drilling report: Cooper Energy

The well is the first of a three-well drilling campaign in PPL 220 and PRL 98 in the Cooper Basin, which includes the Callawonga-11
Read More

InterOil commences Antelope flow testing

The testing, together with the drilling of Antelope-6 on the eastern flank of the field, will help delineate the size, reservoir connectivity and productivity
Read More

Drilling report: AWE

Irwin-1 encountered elevated gas shows in the Dongara/Wagina sandstones primary target, with gas shows also observed in the secondary objectives – the Caryginia Shale,
Read More

Drilling report: Key Petroleum

All long lead items are currently in Perth ready to be mobilised to the Dunnart-2 location. DCA Rig #6 is currently in the DCA yard
Read More

Drilling report: AWE

Irwin-1 is currently at a measured depth of 3,265 m, with a total planned depth of 4,064 m. The interval will be further evaluated with
Read More

Drilling report: Woodside Petroleum

The well reached a total depth of 3,347 m within the Jurassic Sandstone target, with wireline logging confirming the discovery through the recovery of
Read More