Drilling report: Buru Energy

Wireline logging of the well has been completed, with the well plugged back to 2,145 m. The Atlas 2 rig has now been released and
Read More

Drilling report: InterOil

The Antelope-4 appraisal well was suspended in May 2015 at a true vertical depth subsea of 2,056 m, approximately 158 m above the field
Read More

Drilling report: Buru Energy

Interpretation of the wireline logs indicates a gross oil bearing interval of some 23 m is present at the top of the interpreted Ungani
Read More

Drilling report: Buru Energy

Preparations are currently underway to commence wireline logging. Hydrocarbon indications have been observed in the section below the interpreted Ungani Dolomite, which will be evaluated
Read More

Drilling report: Transerv Energy

The well is the first in a pivotal two-well drilling program in the fields, and is expected to take 28 days to reach the
Read More