The drilling program is focussed on the eastern area of the permits within the Eos and Glenora blocks, and forms part of the company’s
Read More
Buru outlines Ungani potential
Buru’s Ungani oilfield was discovered in the Canning Basin in 2011 and with the original 2C resources sitting on 6.65 MMbbl of oil. As part of the production upgrade, Buru is installing an artificial
Read More
Read More
Waitsia-3 drilling update
As of this morning, the Waitsia-3 appraisal well was at 2,782 m Measured Depth below Rotary Table (MDRT) and was preparing to drill ahead
Read More
Read More
AGL import plans gather speed
According to the Australian, AGL Has committed to choosing a site for the terminal in either NSW, Victoria or South Australia
Read More
Read More
Cape lands Ichthys contract
Cape’s subsidiary, Cape Australia Onshore Pty Ltd, secured the contract from JKC Australia for the provision of insulation and coating services at the project’s
Read More
Read More
Arrow secures CSG services deal
The joint venture between Clough, Amec Foster Wheeler and China Petroleum Engineering (CACJV) have been successfully delivering engineering and other services for Arrow’s upstream
Read More
Read More
QLD’s commitment to gas is good policy: APPEA
Australian Petroleum Production and Exploration Association (APPEA) Queensland Director Rhys Turner said the Queensland Government’s Powering Queensland Plan, which outlines plans to restart Stanwell
Read More
Read More
Gorgon Train 1 restarts ahead of schedule
Production from Train 1 was halted on 12 May due to a faulty flow measurement device and it was expected to shut down for
Read More
Read More
Callawonga-15 spuds
As of yesterday morning the well had been drilled to 262 m and was drilling ahead in a 12 ½ inch hole in the
Read More
Read More
Company news: McConnell Dowell, INPEX, APA, LNGL and more
McConnell Dowell has been awarded a construction contract by Jemena for the Northern Gas Pipeline (NGP) Project.
McConnell Dowell’s scope of work involves the engineering,
Read More
Read More