A CK Infrastructure Holdings-led consortium (CKI) has lodged a $13 billion takeover bid for APA Group, owner and operator of some of Australia’s key
Read More
Jaws ready for completion
Analysis of the pre-processed microseismic data shows positive indication of a successful fracture stimulation campaign. Since the stimulation, an increased water response at Klebb-1 and Klebb-2 has also
Read More
Read More
Paul Adams steps down at Jemena
Mr Adams will be succeeded by Frank Tudor, who was until recently CEO of Horizon Power in Western Australia.
Mr Adams will continue as Managing
Read More
Read More
AGL secures Crib Point jetty agreement
AGL has signed Work, Lease and Berthing and Jetty Agreements with the Port of Hastings Development Authority (PHDA) for the long-term use of Crib
Read More
Read More
McGowan: bring gas onshore
According to the West Australian, the Premier said floating gas processing technology was unsuited to WA as he looks to
Read More
Read More
CKI launches APA bid
The bid values APA shares at $11 per share and permits a distribution not exceeding $0.24 per stapled security payable in respect to the six months to 30 June 2018. At this stage, the APA Board makes
Read More
Read More
Easternwell sign drilling contract
The contract, valued at $8.9 million, involves the drilling of two wells to depths of 4,000 m and 4,300 m using Easternwell’s Rig 106. “We are pleased to work with Origin on this
Read More
Read More
Repsol sells PNG interests
This will include Repsol’s 40 per cent interest in the Elevala/Ketu and Stanley fields, which are the foundation fields for the standalone gas aggregation project, Western LNG. The Western LNG Project,
Read More
Read More
Prelude cooling down
The Gallina, an LNG carrier from Singapore, carried out the import that will allow Shell to test processes and systems before the subsea wells are opened at startup. It’s the first time
Read More
Read More
IPB renews WA-424-P
Having satisfied all requirements associated with WA-424-P’s primary and secondary work programs, IPB lodged an application for renewal and partial relinquishment of the permit in March 2018. IPB
Read More
Read More