In Beach Energy’s recent reprocessing of existing 3D seismic data over the Yolla Field, it has revealed a previously unidentified fault block, Yolla West, is now drillable from the existing Yolla platform. If successful, Yolla West could be connected to the already existing Lang Lang Gas Plant shortly after drilling. Beach Energy has decided to …
Tek-Ocean has announced it will provide additional services in the Bass Strait during November and December using the newly rectified TEK-Ocean Spirit. TEK-Ocean is an integrated service offering to clients in the oil and gas, marine and renewable energy sectors. The company reported it had been awarded further work in addition to existing contracts with …
Beach Energy’s proposed Prion 3D marine seismic survey (3DMSS) in the Bass Strait, Tasmania, has been opened by the national regulator for comment. As the operator of retention leases T/RL2, T/RL4 and T/RL5, Beach advised that the purpose of the 3DMSS is to acquire geophysical data to gain a deeper knowledge of the subsurface geology …
The CarbonNet Project is investigating the potential of establishing a commercial-scale carbon capture and storage (CCS) network that would bring together carbon dioxide capture projects in Victoria’s Latrobe Valley and transport it via a shared pipeline into offshore Bass Strait sites. Recently, MMA has been awarded three contracts for CarbonNet valued with a total revenue …
Strong operating performance also underpins Beach’s decision to increase standalone FY18 production guidance to 10.6-11.0 MMboe, up from the previous guidance of 10.0-10.6 MMboe. Beach’s production for the December 2017 quarter was up 3 per cent to 2.6 MMboe, including record operated gas production in December. Revenue also increased by $30 million up to $208 …
Victorian Minister for Resources Tim Pallas launched the report with Victoria’s Lead Scientist Amanda Caples at the Core Library in Werribee on Friday last Read more