Jemena has signed an agreement with Tamboran Resources to increase the capacity of its Northern gas pipeline (NGP) and extend it from the Northern Territory to Queensland. The memorandum of understanding
Read More
West Erregulla JV completes first phase of drilling
Strike Energy has advised, on behalf of its joint venture partner Warrego Energy, that it has completed drilling of the first intermediate hole section down to 2462 metres measured depth at West Erregulla 3 well, Western Australia.
Read More
Read More
Arrow awards Valmec with Surat gas contract
Valmec has secured early works on the first phase of Arrow Energy’s Surat gas project, located in south-west Queensland.
Read More
Read More
Australian LNG shipments on the road to recovery: EnergyQuest
Australian liquefied natural gas (LNG) shipments in October were higher compared with September, primarily due to increased production at the North West Shelf and Gladstone LNG projects. Outlined in EnergyQuest’s
Read More
Read More
West Erregulla JV continues drilling success
Strike Energy has advised, on behalf of its joint venture partner Warrego Energy, that it has completed drilling of the first intermediate hole section down to 2462 metres measured depth at West Erregulla
Read More
Read More
Valmec locks in contract for Surat gas project
Valmec has secured early works on the first phase of Arrow Energy’s Surat gas project, located in south-west Queensland. The company’s initial contract with Arrow is to deliver critical water treatment
Read More
Read More
Woodside confident for year ahead
Woodside chief executive officer Peter Coleman has described 2020 as the year where the company has risen to challenges and delivered exceptional operating performance. Speaking at the company’s
Read More
Read More
TGS granted approval for Carnarvon Basin survey
TGS-NOPEC Geophysical (TGS) has received approval from the Australian regulator to undertake a Caprelous-2 3D marine seismic survey (MSS) in the Carnarvon Basin, Western Australia. The National Offshore
Read More
Read More
Venus-1 pilot nears completion
Strata-X Energy and Real Energy have reached a total depth of 715m at the Venus-1 well within the Surat Basin Walloon coal seam gas (CSG) fairway, Queensland.
Read More
Read More
Beach reaches important milestone at Enterprise
Beach Energy has made a new gas discovery at Enterprise 1 in the nearshore Victorian Otway Basin following drilling of the well.
Read More