, , , , , , , , , , ,

Armour drill stuck in Horseshoe well

The Silver City Rig 20 commenced drilling earlier this month, with the well having progressed to a depth of 1,523 m. Armour has reported that while through the Hutton sandstones, the drill string has become stuck in a hole, through a process known as differential sticking, in which hydrostatic pressure of the drilling fluids is …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend